Construction Images (Estimated completion date: July 2007)
October-November 2007  

June 06  July 06 Aug 06 Sept 06 Oct 06 Nov 06 Dec 06 Jan 07 Feb 07 Mar 07
Apr 07 May 07 June 07 July 07            


6/7/07 Meeting room just needs a ceiling and finish work.

Meeting room looking toward the west. There is a screen that will come down against the wall for presentations .

The reference area has been painted.

Director's office has a coat of pale green.

Skylight has been plastered. Lovely.

The scaffolding is down!

Our own "grassy knoll" for the septic.

This is leftover dirt for landscaping.

Circulation desk area is all plastered and waiting for paint.

Project managers John Sayre-Scibona and Gordon Schaaf, Architect's representative Rich Ryan and Architect Richard Smith survey the roof work.

6/21/07 Children's room east wall.

Children's room west wall for New books.

Children's Room curved east wall is painted a nice bright yellow. Doors lead out to a future garden.

Children's Room, toddler corner sports a nice purple wall. A matching love seat will sit under the window.


Experts ponder the exterior stair emergency exit.



Detail where the old meets the new.

7/19/07 Lighting detail above the Tile Mural Wall.

Asphalt gutter backsplash--keeps the water away.

Column detail of the old library balcony.

The check in space of the new Circulation Desk. Not permanent yet!

The interior of the Circulation Desk.

New Circulation Desk, temporarily in place.

7/26/07 Wood railing detail. The wood will be stained to match the doors and old woodwork.

Kitchen just off of the meeting room. We still need a refrigerator.

Kitchen almost done.

Looking from the new space into the link between the new and old libraries.

Old library will hold the fiction collection. Stairs formerly to the Director's Office now will be used for storage.

Old 1904 stacks awaiting repainting and a good dusting!

Old main entrance doors are being refinished.

Transition strips to absorb the give and take between the old building and the new.

Railing above the lobby, the wood rails will be stained.