Construction Images (Estimated completion date: July 2007)
February-March 2007
| June 06 | July 06 | Aug 06 | Sept 06 | Oct 06 | Nov 06 | Dec 06 | Jan 07 | Feb 07 | Mar 07 |
| Apr 07 | May 07 | June 07 | July 07 |
|
2/1/07 View from the Circulation Deck towards the font entrance. |
The ramp from circulation to the offices and the old library. |
|
Installing the stairs. The blue sky is from the tarp covering the skylight hole. |
Another view of the foyer and stairs. |
|
Meeting room is the Keeper of the Doors! |
Part of the stair railing. |
|
Stair railing will be painted to complement the rest of the interior colors. To be determined. |
A special cut for the opening to the mechanicals and storage. |
|
The lovely new Children's Program Room. |
Looking towards the Children's Librarian's office. The floor cuts are electrical boxes. |
|
Inside one of the curves. There will be comfortable seating on both floors in this area. |
The new adult areas. Non-fiction, Reference, Dvds, Books on Tape and CD will all be housed in this area. |
|
A ship's ladder will take the place of this red ladder for roof access. |
The future Young Adult area overlooks the front entrance on Maple Street as well as the foyer on the floor below. |
|
Bathrooms on the second floor for convenience. |
The outline of the closet in the Director's office on the left and a small cubby in the Historical Room. |
|
Looking from the south east corner upstairs towards the old library. |
Scanning left to right from Southeast corner. |
|
Looking left to right from southeast corner. |
The South wall of the new library. The curve looking out over the park is just in the middle right of the picture. |
|
Inside the children's room looking toward the meeting room. |
Children's meeting and Story hour room. |
|
Small kitchen is starting to take shape. The ladder is standing where a refrigerator would go. |
Looking through the meeting room walls into the children's program room. There is a small closet on the left in the meeting room with a small sink on the right in the children's room. |
|
View of the foyer from the meeting room. |
Looking south from inside the meeting room. There is an emergency exit on the right. |
|
The spectacular skylight will be installed here. The natural light will wash down the exterior curved wall of the old library highlighting her gorgeous architectural features! |
3/15/07 The backside of the skylight. The ceiling will run from the lower edge of the soffit. |
|
The window frames are all in. The fiberglass exterior wrapping is complete. |
3/22/07 The roof repairs are being completed. |
|
Slate replacement and new copper snow guards installed. |
Here are the skylight glass panels waiting for installation. |
|
The chimney has great lines! |
|