12/1/06 The steel is going up! |

|

|

|

|

Mushrooms are growing on Pleasant Street. |

12/4/07 One junction box found in the furnace room. |

Leach field hill facing Park Street. |

Second floor steel. |

Lower level meeting room, upper level Director's Office. |

Elevator shaft just on the left. |

12/21/06 Same area with steel decking. |

Looking across toward reference. |

The reference area will be the new outside curve. |

Looking across just to the right is the historical room. |

Looking across is the Young Adult area and Director's Office. |

Between the four steel beams is the Historical Room. |

Director's Office overlooks Maple Street and the new Main Entrance. |

Circulation Desk will have several windows for natural light. |

Children's Program room will be just here beyond the nearest beam. |

Walkthrough from the new addition into the old library with the
exposed exterior brick walls--lovely! |

The former children's reference area will be storage, HVAC, data and
other utility closets. This is looking into the new addition. |

The exterior curve of the old library will be open to below in the
new entryway and foyer. |

Inside the curve will be magazine and newspaper reading areas. |

1/19/07 Fire equipment, sprinkler system installation |

Beautiful wood baulaster, slightly dust covered! |

Looking toward the Children's room from the elevator. The concrete
floor will be laid over the insulation and wire mesh. |

The meeting room waiting for concrete. |

The roof looking east/north east. These are air handling units. |

This is the roof access portal. |

Guess who? Looks like 1600 Pennsylvania Avenue. |

The south side--and new entrance--is the last to be wrapped up. |