Lincoln Park |
Georgetown Peabody Library |
| Home | Catalog |
Internet Resources |
Children's Programs | Hours & Directions | Trustees | Staff | Friends |
| About Us | Fundraising | Museums | Building Project | George Peabody | Meetings | Jobs | Town Links |
Construction Images (Estimated completion date: July 2007)
June-July 2006
| June 06 | July 06 | Aug 06 | Sept 06 | Oct 06 | Nov 06 | Dec 06 | Jan 07 | Feb 07 | Mar 07 |
| Apr 07 | May 07 | June 07 | July 07 |
![]() |
Groundbreaking, May 13, 2006 (left to right): Gloria
Maina, Building Committee; Peter Byerly, Architect; Jack Moultrie,
Building Committee; Mary Saunders, Trustee; Rick Lamarre, Contractor;
Chris Laut, Trustee; Sue Clohecy, Trustee; Ron Chorzewski, Trustee; Ruth
Eifert, Library Director; Tom Falzareno, Trustee; Laura Zalewski,
Trustee; Nancy Aberman, Building Committe Chair; Lonnie Brennan,
Selectman
|
|
Asphalt driveway being cleared. The War memorial will be moved to another location. The new septic tank goes under here. |
|
|
|
|
|
Driveway of former main entrance. |
One large pile of topsoil at the end of the park! |
|
6/12/06 Marking of the outline of the new foundation. (The tiny orange cones.) |
|
|
|
|
|
More foundation ditch. |
6/27/06 Wood forms for the concrete footings. This is the west wall of the meeting room. At the far end (by the barrel) is the front entrance. |
|
|
|
|
Former bathroom, future ramp up from the main Circulation Desk. |
The former children's story time room. Future data equipment room and storage. |
|
Former circulation area. This window on the right will be a walk through into the new addition. |
The round room shelving has been removed revealing these panels. Any ideas? Possibly picture "frames" for art? |
|
|
|
|
7/11/06 Metal rebar installed prior to concrete. |
The round curve at the back of the new library. It looks very much like the back of the old library! |
|
From the right corner to the left of the picture is where the Children's Program Room will be. |
7/20/06 The future meeting room will seat 75-80. |
|
Column details. These columns will be repaired and refinished as needed. |
Inside the 1904 building, just above the old circulation desk. |
|
The back foundation below the small windows will feature our handcrafted tile wall, Georgetown Generations. This area will be in the Main Entrance foyer. |
The north foundation wall facing Pleasant Street. |
|
7/28/06 Concrete footings are in. |