Construction Images (Estimated completion date: July 2007)
April-May 2007
| June 06 | July 06 | Aug 06 | Sept 06 | Oct 06 | Nov 06 | Dec 06 | Jan 07 | Feb 07 | Mar 07 |
| Apr 07 | May 07 | June 07 | July 07 |
![]() 4/6/07 Exterior wall looking down from the second floor. Note the copper flashing between the two levels. |
![]() The round magazine room, former doorway prepares for shelving. The antique door will be used in the Directors office for a closet. |
![]() Lower level block wall. |
![]() The back of the Children's room wall. |
![]() The Children's program room. The door has a window just to the right. |
![]() Entry doors from the Children's room looking into the lobby. |
![]() Window frames wait for installation. |
![]() New full door for the storage areas on the third floor. |
![]() Looking from the old library across the atrium to the reference area. |
![]() The view of the back of the old library from the stair landing in the lobby. The skylight frame is just visible above. |
![]() The lobby wall, home of the Georgetown Generations wall tile mural. |
![]() 4/26/07 The tile wall will be covered with concrete backer board in anticipation of holding our tile mural. Each of the three small windows above can hold four 12inch square tiles. |
![]() Lights will illuminate the back of the old library for dramatic effect. |
![]() Close up of the reference room windows that overlook the lobby below. |
![]() Looking across from Young Adults area. |
![]() Looking down from Young Adults area. |
![]() The old library is being prepared for painting. |
![]() Scraping away at the crown moldings. |
![]() The former reference room windows. |
![]() The new entrance facing Maple Street. |
![]() Fire alarm and indicator box in new entry. |
![]() The Reference reading room. |
![]() 5/10/07 The Reference reading room with some of the walls and ceilings in. |
![]() Another view of the Non Fiction and Reference area. |
![]() Exterior of the back of the new library. |
![]() The back exterior wall of the children's room, with the reference reading area upstairs. |
![]() Close up of the upper brick exterior. |
![]() New front doors are being installed. |
![]() Front storefront windows that look out over the front entrance on Maple street. |
![]() Overlooking the exterior of the old library with lobby below and across to New Books and browsing area. |
![]() Reference and Non Fiction with blue board. |
![]() Original 1905 shelves will be used for Fiction. |
![]() 5/22/07 The plastering begins in the children's room. |
![]() Plastering nearing completion upstairs. |
![]() Non-fiction looking south. |
![]() Looking through to the old library across the lobby. The reference desk and low shelving will be below the windows. |
![]() Looking across the lobby from the new books. The skylight offers lots of light. |